SIMBIOTEK DESIGN LAB
  • Home
  • Projects
    • Food + Beverage
    • Residential + ADUs
    • Multi-Family Residential
    • Commercial
  • In Progress
  • About
  • Contact
  • Blog/FAQs

Learn more about the process of your desired project

Frequently Asked Questions
​ADU = Accessory Dwelling Unit

Simbiotek Architecture Is Now WBENC-CertifiedĀ as a Women Owned Business!

10/2/2026

0 Comments

 
Picture
We're proud to share that Simbiotek Architecture is now certified as a Women's Business Enterprise (WBE) by the Women's Business Enterprise National Council (WBENC). The certification formally recognizes what has been evolving: Simbiotek is a woman-owned, woman-led architecture firm, and the design decisions on every project are made by a woman licensed architect.
For our clients, partners, and the communities we design for, this milestone opens new doors while reinforcing the values that shape our work.
What WBENC certification meansWBENC certification is the most widely recognized national certification for women-owned businesses in the U.S. To earn it, a business must be at least 51% owned, controlled, operated, and managed by women.
The process is thorough. WBENC reviews a firm's ownership, finances, governance, and management records, then conducts a site visit to confirm that a woman runs the business day to day. For us, that meant documenting years of corporate records and showing how decisions are made across our studio, from design direction to contracts and finances. WBENC
Why it matters in architectureWomen are still underrepresented in architecture. In 2024, only 27% of U.S. architects identified as women, though more than 2 in 5 newly licensed architects now do, according to NCARB. Women-owned firms are rarer still.
We believe the built environment is better when the people designing it reflect the people living and working in it. Our certification is one small way to make that visible, and to show the next generation of women in design that leading a firm is a real path.
What this means for our clients and partnersMany corporations, institutions, and public agencies set supplier diversity goals for their design and construction spending. Hiring Simbiotek now counts toward those goals.
  • Corporate and commercial clients can include a certified WBE architect on tenant improvements, retail, hospitality, and recreation projects to meet supplier diversity targets.
  • General contractors and design-build teams can add Simbiotek as a certified WBE subconsultant when bidding projects with diversity participation requirements.
  • Public and government agencies gain a qualified, women-owned architecture partner with experience on municipal, county, and federal work, including U.S. Customs and Border Protection facilities.
  • Homeowners and developers get the same thing they always have: a licensed architect who knows San Diego zoning, ADU and SB-9 rules, and the California Building Code inside and out.

What stays the sameThe certification is new; our approach is not. Every Simbiotek project still starts with listening: to the client, the site, the code, and the neighborhood.
  • Sustainable design at the core. We design for daylight, natural ventilation, efficient envelopes, and Title 24 performance that goes beyond the minimum - when desired.
  • Permitting expertise. We guide clients through San Diego city and county plan check, from ADUs and SB-9 lot splits to commercial tenant improvements.
  • Personal attention. As a small studio, clients work directly with the architect leading their project.​
0 Comments

Getting to the Finish Line to Open Your Food Establishment

6/4/2026

0 Comments

 
@thesilverhoofcreamery @lksd_social
You have a vision, a dream on opening a new eatery or food establishment. But navigating the health dept and city submittals seems daunting. That's where Simbiotek comes in! I will work with you every single step of the way including answering as many questions as needed and problem solving every issue with you.

Here are some of the most common steps to obtain a health permit: 
  1. Hire an architect, like Simbiotek
  2. Find the space you want to lease and start lease negotiations
  3. Once your lease is looking like it will go through, you can start design
  4. Assess what equipment is there, you can reuse, or what equipment you will need, make a list and go online to find which manufacturer or spec you want to use
  5. Have your architect lay it out in the space
  6. I will make suggestions on what works and what doesn't fit to either find a new size or different piece of equipment
  7. Once the equipment and layout is finalized, submit to the health dept. The first review takes up to 30 business days
  8. Some items to prepare for:
  • Must have self-closing doors and windows, unless you sign the rodent prevention documentation and are not working with milk products
  • Must have a water heater capable of reaching 120 degrees Farenheit
  • Some equipment may need a hood, however there are ways to avoid this requirement
  • Must be able to wipe walls such as with installing tile, Fiber reinforced panels or wipeable paint
  • Must have lockers for employees
  • Must have a three compartment sink (with floor sink/air gap) and a hand sink, at minimum 
  • Must have cove base tile installed around existing or new cabinetry or at the base of walls
  • All equipment must have a NSF or UL Listing, a lot of items on Amazon don't so beware!
  • Must have soap and paper towels installed at hand sinks and in restrooms. They must be filled before inspection

TIME - It generally takes about 2 reviews through plan check before a project is approved.

COST - In addition to architectural or engineering fees, the health dept fees are below:
0 – 1,999 sq. ft. -      $1,534
2,000 – 5,999 sq. ft.-      $1,931
6,000 – 9,999 sq. ft. -     $3,153
10,000+ sq. ft. (one prep area) -     $3,407
Rechecks cost $408 each and expedited review, if they deem available, is double the fees.

INSPECTIONS - After the health dept has approved the plans you can call for mid/final inspections. These take 2-3 weeks typically to obtain so call early and ask for after hours inspection which expedites the process for a higher fee. If you are doing a smaller amount of updates, you can forego the mid inspection. If you received corrections, you will need to request another inspection and pay the $408 again in most cases.

If you also need a building permit to relocate walls, plumbing and electrical. I can also walk you through that process, which happens simultaneously but often requires engineers to be hired in order to complete the design. 

There is a lot of knowledge and information that goes into getting that coveted "A" so you can open your doors, I am happy to answer any initial questions you may have at [email protected].
0 Comments

Why hire an architect instead of a drafter?

1/27/2026

0 Comments

 
Architects are licensed professionals that have gone through rigorous education, training and testing on building life safety and construction methods. Our stamp hold us liable to the work we produce for the safety of the public. When you hire a drafter, they may be able to create a floor plan or renderings of your future project but when it comes time to go through plan check you may run into major issues. 

Property owners often come to me with drafters that have either not been able to finish getting through city comments or they have done the initial work but left the owners to do plan check on their own. Most cities require stamped drawings from an architect to obtain your permit unless its a project small enough not to warrant one. It seems like it would be easy to just have an architect stamp someone else's work and move on, however once that occurs we are liable for all of that person's work - right or wrong. It requires us to start over with our own drawings, understanding of the project and even going to do our due dilegence by visiting the site, etc. Drafting drawings also don't have properly vetted construction details to build the project. 

Architects are valiable in not only navigating city permitting but construction with your contractor. We are there throughout construction for unforeseen conditions and to coordinate with engineers if needed for additional detailing. 

The California Architects Board offers a Consumer guide to hiring an architect here.
​AIA San Diego also explains this further here.
0 Comments

What is the process like with the City of San Diego to permit an ADU or JADU?

8/20/2025

0 Comments

 
 The process for the city of San Diego to permit an ADU or JADU is outlined below. This process typically takes 5-7 months, sometimes longer with complicated projects. Keep in mind, if you need to upgrade your water line due to adding more toilets etc over the limit of your current one, you will need a Right of Way permit. Also, if you need to demolished your garage while prepping to build the ADU, you may need a demo permit in some cases as well. All of these can run simultaneously to make the process go faster. Below is a graphic that explains the process. Other cities in Southern California and the County of San Diego are similar, with minor changes in the order of what is shown below. The County of San Diego does not do online permitting, so the process takes a little more time and cost due to hours spent in person and printing costs. 

If you have any questions, please reach out! [email protected]
Picture
0 Comments

Multi-Family ADU Possibilities

7/28/2025

0 Comments

 
Picture

haylDid you know, if you own a multi-family property, you can add up to 25% of your total current units as ADUs? And...in most cities you are allowed to use uncovered parking spaces to develop these ADUs as well as:
  • Recreation Rooms
  • Offices
  • Garages
  • Covered parking spaces
  • Uncovered parking spaces
  • Any enclosed space not being used at a minimum of 150 sf

Steps to create your ADUs:
1. Engage an architect and reviewing all planning and zoning requirements for that city/county.

2. Gather your Grant deed, title report and schedule a site visit with the architect and engineering team.

3. Working with your architect to design and layout your ADUs per your goals. Some items to decide on:
- How many bedrooms do you want based on rent return?
- Will you do a full kitchen or an efficiency kitchen which has a hot plate and sink only?
- Do you want to create outdoor space for the unit?
 - Will your appliances use gas or electrical service?
- What is currently available sewer and will you need a pump if your ADU is below sewer line? Suggest to hire a plumber to put a camera scope through the line. 
- Verify existing plumbing fixtures on site, how many washer/dryers, dishwashers, etc - Architect/engineer to verify if current water service is a large enough capacity to handle new demand added. If not, you will need to upgrade water service with the city/county.
- What will the design aesthetic be? Will it match existing property or be a different style?

4. Sign up for new service as soon as possible with SDGE as wait times can be long - only owners can sign up through their website. Your electrical contractor or engineer can verify existing space in electrical panels or on site service to see if you have possibility of enough power to create sub panels for each ADU. Generally min. 150 amps per panel, most do 200 amps. Note, adding a separate meter takes longer and costs more than feeding from existing service. 

5. Release your architect to prepare construction documents, including engineering if needed. 

6. Submit your plans to your local juridiction for review.

Contact Simbiotek to get your project started.
[email protected]

0 Comments

    Archives

    June 2026
    January 2026
    August 2025
    July 2025

    Categories

    All
    ADU

619-500-2925                 [email protected]                 Copyright Simbiotek Design Lab Inc. 2014-2025
  • Home
  • Projects
    • Food + Beverage
    • Residential + ADUs
    • Multi-Family Residential
    • Commercial
  • In Progress
  • About
  • Contact
  • Blog/FAQs